Rebar Chair Calculator

A chair sets a dimension, not just a count — height from cover, gap between tiers, then the count

← Back to the calculator
24 ft × 20 ft double-layer slab, #5 bar both ways at 12 in o.c., 1.5 in cover → 2 in chair calculated (1.81 in), a 4.38 in clear gap between tiers on an 8 in slab, and 42 chairs on a 4 ft grid.

A chair does two jobs and only one of them is being counted. It holds the bar up, and it holds a dimension: the cover under it and, in a double-layer mat, the clear gap between the two tiers. Height first: chair = cover + db/2 = 1.5 + 0.3125 = 1.81 in, so order a 2 in chair. Then the count on a support grid: 7 across × 6 along = 42 chairs, against the 120 a flat one-per-4-sq-ft rule gives — nearly three times too many.

Open the calculator for the bar counts and weight, or read the four steps below for the chairs themselves.

2 inChair height
4.38 inTier gap
42Chairs, 4 ft grid

What a chair actually does

A rebar chair is a small stand that holds reinforcing bar at a set height above whatever it sits on. Every page about them stops there and moves straight to counting, and that is where the mistakes start, because a chair is doing two jobs at once.

The first job is support: keep the bar from sagging to the bottom or floating to the top before and during the pour. The second job is dimension: a chair is the only thing in a slab that holds a distance — the cover beneath the bottom mat, and the clear gap between the two tiers of a double-layer mat. Get the count right and the height wrong and you have still built the wrong slab, because the height is what sets the effective depth of the steel doing the work.

Search for a rebar chair calculator and almost everything that comes back gives you one flat number: chairs equal to area divided by some figure per square foot. That rule answers "how many" and never "how tall", and even the count it gives is usually far too high. This page does all three numbers on a 24 ft × 20 ft slab with #5 bar both ways at 12 in o.c. in a double-layer mat.

Step 1 — chair height from cover and bar size

A chair is sold by height, and its height is measured from the surface it stands on to the underside of the bar it carries. That makes it the clear cover plus half a bar diameter, because the cover is measured to the outside face of the bar, not to the bar's centre:

chair height = clear cover + ( bar diameter ÷ 2 ) bottom mat, #5 bar (db = 0.625 in), clear cover 1.5 in: height = 1.5 + 0.3125 = 1.8125 in → order a 2 in chair the same mat with a #4 bar (db = 0.500 in): height = 1.5 + 0.2500 = 1.7500 in → still a 2 in chair the same mat with a #6 bar (db = 0.750 in): height = 1.5 + 0.3750 = 1.8750 in → still a 2 in chair

The half-diameter term is the one people drop, and it is small enough to ignore on one bar and large enough to matter across a heavy mat. It also explains why the bar size barely moves the chair you order: chairs come in 1 in steps, so from #4 to #6 at the same cover you are still rounding to the same 2 in chair. What moves the chair size is the cover, and cover is set by exposure, not by the bar.

Clear cover (in)Typical situation#4 height#5 height#6 heightChair ordered
0.75interior slab or wall, #11 and under1.00 in1.06 in1.13 in1.5 in
1.5exposed to weather, #5 and under1.75 in1.81 in1.88 in2 in
2.0exposed to weather, #6 and larger2.25 in2.31 in2.38 in2.5 in
3.0cast against and permanently in contact with earth3.25 in3.31 in3.38 in3.5 in

Swipe the table sideways for more columns →

The cover figures along the left are the work of the concrete rebar page, which derives them from ACI 318-19 and works the same cover-to-chair chain in the context of a full takeoff. Here the point is simply that the chair height follows the cover, and the cover follows the exposure, in that order.

Order up, not down. Chairs are made in 1 in steps, and a chair under height cannot be fixed in the field once the bar is tied over it. Round the calculated height up to the next stock size, and if the calculated height lands almost exactly on a stock size — 2.0 in, say — go to the next one up unless the tolerance is unusually generous, because the ACI 117 placing tolerance works against you, not for you.

Step 2 — the gap between the two tiers

In a single-layer mat the chairs only set the cover. In a double-layer mat — a suspended slab, a raft, a heavily loaded slab on grade with top steel — the chairs carry a second job that no per-area count even looks at: they hold the two mats apart. That distance is the slab depth minus both covers minus one bar diameter, and it is a designed number, because the top steel is only as good as the depth it ends up at.

clear gap between tiers = slab depth − bottom cover − top cover − one bar diameter 8 in slab, 1.5 in cover top and bottom, #5 bar: gap = 8 − 1.5 − 1.5 − 0.625 = 4.375 in the same slab with a #6 bar (db = 0.750 in): gap = 8 − 1.5 − 1.5 − 0.750 = 4.250 in

Run the same sum at a range of slab depths and the gap the chairs have to hold open grows with the slab:

Slab depthClear gap between tiersTop-steel effective depthChair to carry the top mat
6 in2.38 in4.19 in2 in + a 2.5 in stand
8 in4.38 in6.19 in4.5 in (or a 2 in chair on a 2.5 in base)
10 in6.38 in8.19 in6.5 in
12 in8.38 in10.19 in8.5 in
14 in10.38 in12.19 in10.5 in

Swipe the table sideways for more columns →

Top-steel effective depth is the thickness to the centroid of the top bars: d = depth − top cover − db/2. On the 8 in slab that is 8 − 1.5 − 0.3125 = 6.19 in. Clear-gap figures assume 1.5 in cover top and bottom and a #5 bar, per ACI 318-19.

This is where chair height stops being a consumable and becomes a structural input. Take the 10 in slab: the top steel should sit at 8.19 in effective depth, and the chair is what puts it there. Let the top mat sit 1 in low — a chair one size short, or a few chairs too far apart so the bar sags between them — and the effective depth drops to about 7.19 in, roughly 12 per cent less. Section moment capacity moves with the effective depth, so that is a material loss in capacity that is completely invisible once the slab is poured.

Section through a double-layer slab showing top and bottom covers, the chair heights that set them, and the clear gap between the two tiers A chair sets cover and tier gap — two dimensions, one device 8 in slab, 1.5 in cover top and bottom, #5 bar — clear gap between tiers 4.38 in 8 in slab depth top mat bottom mat top chairs set the top cover bottom chairs set the bottom cover 4.38 in clear gap gap = depth − 1.5 − 1.5 − 0.625  =  4.375 in — the chairs hold this, and it sets the effective depth of the top steel. Let the top mat sag 1 in and the effective depth of that steel falls about 12%, which nothing on site will show you after the pour.
A double-layer slab section. Two chair lines do two different jobs: the tall ones set the gap between the tiers, and the short ones set the bottom cover. The red dimension is the one a per-area chair count never mentions, and it is the one the structural design depends on.

Watch: chair height and tier gap

16-second walkthrough: how a chair height comes from clear cover plus half the bar diameter, what actually sets the gap between two mats, and why the count is a support grid rather than a per-area rule. From the rebarcount channel.

Step 3 — count the chairs on a grid

Now the count, and it is a grid count rather than an area count, for the same reason bar count was a step function and not an average: one chair supports a patch of mat, and chairs are laid out on a regular support grid, normally 3 to 4 ft on centre. Count the grid points:

chairs = ( floor( length ÷ grid ) + 1 ) × ( floor( width ÷ grid ) + 1 ) 24 ft × 20 ft slab, 4 ft support grid: across = floor( 24 ÷ 4 ) + 1 = 6 + 1 = 7 along = floor( 20 ÷ 4 ) + 1 = 5 + 1 = 6 chairs = 7 × 6 = 42 the same slab, 3 ft support grid: across = floor( 24 ÷ 3 ) + 1 = 9 along = floor( 20 ÷ 3 ) + 1 = 7 chairs = 9 × 7 = 63

The + 1 is a chair at the start of each run, exactly as it is a bar at the start of a row on the spacing page. Drop it and you lose a whole edge line of support, which is the line that carries the cantilever over the formwork. Add a small breakage allowance on top, because chairs get stood on and knocked over during placing:

Support gridAcross 24 ftAlong 20 ftChairs (net)Per sq ftWith 5% breakage
5 ft55250.05227
4 ft76420.08845
3 ft97630.13167

Swipe the table sideways for more columns →

Read the middle line as the default and the two outer lines as the adjustments. Tighten toward 3 ft — 63 chairs, half again as many — where the mat is heavy, where the bars are large enough to sag under their own weight across a 4 ft span, or where the top mat will be walked over during placing. Go to 5 ft only on light single-layer mesh where nothing is being carried on the steel.

42 to 63 chairs is the range for this slab, and it is a support limit, not a bar-spacing limit. A tighter bar spacing does not by itself need more chairs — one chair under the mat carries every bar that crosses it. What a tighter spacing does change is the number of intersections to tie, which is the grid page's subject.

Step 4 — why the per-area rule over-orders

The shortcut most sites publish, and the one that turns up in a lot of forum answers, is one chair per 4 sq ft. On this 480 sq ft slab that is 120 chairs — against 42 from the grid. It is not a rounding difference; it is nearly three times the chairs you will place, and it comes from treating a chair as though it supports one point of mat instead of a patch.

Way of countingRuleChairs for 480 sq ftVersus the grid
Support grid, 4 ftgrid points42—
Support grid, 3 ftgrid points63+50%
Flat rule1 per 4 sq ft120+186%
Flat rule, tight1 per 3 sq ft160+281%

Swipe the table sideways for more columns →

Why the flat rule is tempting is that it is almost the right shape — chairs do scale with area, so more area does mean more chairs — but it is the wrong function. A grid count grows with the square root of the area per unit area, not linearly, and on any slab of realistic size the two diverge hard. 42 chairs is also not a compromise: it is the count that puts a support within 2 ft of every point on the mat, which is what the 4 ft grid is for.

Two other numbers worth carrying down from the rest of the site. The chairs here are one line item in a takeoff that also includes the lap allowance on the slab page and the tie wire, which follows the intersection count and not the chair count. And when you order, the chairs are bought as units while the bar is bought as whole stock lengths, so the chair figure stays a unit count while the steel figure has to survive the division by stock length on the estimator page.

Step 5 — chair spacing, and why 3–4 ft is not a strength number

Every page says three to four feet, and none of them show the arithmetic. The reason is that the arithmetic does not support the number: a bar under its own weight barely sags at four feet, and at five it is still inside a tenth of an inch. So the rule comes from somewhere else, and knowing where is what tells you when your job can break it.

sag = 5 w L⁴ / 384 E I

With w the bar's own weight in lb per inch, L the clear span in inches, E = 29 × 10⁶ psi and I = πd⁴/64. For #4 that is w = 0.668 ÷ 12 = 0.0557 lb/in and I = 0.003068 in⁴.

BarISag at 3 ftSag at 4 ftSag at 5 ft
#30.000971 in⁴0.024 in0.077 in0.188 in
#40.003068 in⁴0.014 in0.043 in0.106 in
#50.007490 in⁴0.009 in0.028 in0.068 in
#60.015532 in⁴0.006 in0.019 in0.047 in

Swipe the table sideways →

A #4 spanning four feet sags 0.043 in; at five feet, 0.106 in. A #6 at four feet sags 0.019 in. The bar does not need a chair every three feet to hold itself up — it would sit within a sixteenth of an inch of the drawn position at five. So the 3–4 ft figure is not carrying the bar's weight, and two things it is actually carrying are these:

Now the part that explains why nobody's chair quote matches anybody else's. Hercules publishes 2–3 ft in the US and one chair per square metre in the same article. Those are not the same rule. Two feet is 0.25 chairs per sq ft, three feet is 0.111, and one per square metre is 0.093 — the top of their own range is 2.7 times the bottom, and their rule of thumb sits below both. On a 480 sq ft slab that is 120 chairs, 53, or 45, from one page.

Rebar chair spacing chart

Spacing and height are one decision, because the chair that sets the height is the same object that sets the spacing. Read down the column for the member you are pouring, not across the whole table.

Where the chair sitsCover to barHeight, #4Height, #5SpacingWhat sets the spacing
Slab on formwork1.5 in1.75 in1.81 in3–4 ftwalked during placing
Slab on ground or membrane2 in2.25 in2.31 in3–4 ftwalked, plus an uneven base
Double-layer slab, top matper drawingdepth − covers − dbsame3 ftthe tier gap must not close
Footing or pier base3 in3.25 in3.31 in4–5 ftnobody walks it; single mat

Swipe the table sideways →

The footing row is the one people get wrong. A chair in a footing is not holding a tier gap, it is holding cover, and the cover is 3 in where the concrete is cast against earth rather than 1.5 in against a form. So the same #4 that takes a 1.75 in chair in a slab takes a 3.25 in chair in a footing — and the spacing can open to 4–5 ft because there is no top mat to walk on. Same chair, two members, two heights, two spacings.

Chair reinforcement spacing — the same number, a different name

Drawings and suppliers outside the US often call the same thing chair reinforcement spacing, and it is the same measurement: the distance between the supports holding a mat at a set height. The number does not change with the name — 3–4 ft for bar chairs in a slab, 4–5 ft in a footing, and the height still comes from cover plus half a bar.

What does change is the fitting. A mesh chair has a groove that traps wire at a crossing; a bar chair has a saddle sized for a specific diameter. Put a #4 in a mesh groove and it sits on the edges of the groove rather than in it, so the bar is held a little high and can roll. That is why the same spacing on a wire-mesh mat and a #4 mat calls for two different chairs, and why the count is the last thing to decide rather than the first.

Rebar spacers: what they hold, and how many

A spacer is not a chair. A chair stands a mat up and sets its height; a spacer holds the other direction — it keeps a bar off the form face, or keeps two parallel bars at their drawn centres. Most searches for “rebar spacer” mean the second thing, the plastic clip or the wheel, and most pages answer with chairs. This is the other half.

DeviceWhat it holdsWhere it sitsWhat sizes it
Clip-on spacer (plastic)Side coverSnapped on the bar, foot against the form faceBar size and cover — stocked in ¾ to 2 in
Wheel or roller spacerClear gap between two parallel barsBetween the bars, line wire threaded throughThe gap itself, from 1 in up
Concrete dobieBottom cover on groundUnder the bottom mat, on the subgradeThe cover — 2 in or 3 in
Slab chair or bolsterThe height of the matUnder the bar, on form or groundcover + db/2 — the chair arithmetic

Swipe the table sideways →

What sets spacer spacing is the same sag that sets chair spacing, and it runs the other way. A bar's own weight goes as its area, so as d², while its stiffness goes as d⁴ — which means the small bar sags most, not the big one. Read the sag table in Step 5 again with that in mind: at four feet a #3 sags 0.077 in and a #4 sags 0.043 in, so the #3 is the one that needs its spacers closest.

That is what makes four feet a floor rather than a habit. Open a #3 run to six feet and the sag is 0.39 in — outside the ¼ in that ACI 117 allows on cover, before anybody has stood on the mat. A #4 at six feet is 0.22 in and still inside it; a #5 is 0.14 in. So four feet is safe for every bar, six feet is safe from #4 up, and the small-bar, loose-spacing combination is the one that quietly eats the cover allowance.

Count them off the perimeter, not the area, because a spacer only exists where a bar meets something. A 20 ft × 40 ft slab has 120 ft of form edge; at 4 ft that is 30 spacers for the bottom mat, 60 if the top mat is also clipped to the forms. The same slab takes 66 chairs on a 4 ft grid — (20÷4 + 1) × (40÷4 + 1) — so the spacer count is under half the chair count, and it is the number nobody bothers to work out.

Three things a spacer will not do. It will not set height: a mat clipped to the forms with no chairs sits on the bottom, and the top cover becomes whatever the pour leaves. It will not survive the wrong bar: a clip moulded for #4 either will not snap onto #5 or sits proud, and the cover is then wrong by the difference. And it will not hold a lap: two bars in a splice have to stay in contact, or within the lesser of a fifth of the lap and 6 in for a noncontact lap (ACI 318-19), which is tie wire's job.

One material rule that is easy to get wrong: on formwork, plastic is fine, and on ground it is not. A plastic clip or wheel left in the soffit of a slab on grade becomes a void in the bottom of the slab — use a concrete dobie there, because the spacer and the slab have to be the same material. The cover table that sets the size in the first place is on the concrete cover page.

Common questions

How do I work out what height of rebar chair I need?

Chair height is the clear cover plus half the bar diameter: height = cover + db/2. For a #5 bar at 1.5 in cover that is 1.5 + 0.3125 = 1.81 in, so you order a 2 in chair. The half-diameter term is there because the chair sits under the bar while the cover is measured to the outside of the bar. Chairs are stocked in 1 in steps, so round up to the next size.

How many rebar chairs do I need?

Count grid points, not area. On a 24 ft × 20 ft slab at 4 ft on centre that is (24 ÷ 4) + 1 = 7 by (20 ÷ 4) + 1 = 6, so 42 chairs. At 3 ft it is 63. The flat rule of one per 4 sq ft gives 120 on the same slab, nearly three times as many, because it treats each chair as supporting a point of mat rather than a patch.

What sets the gap between the top and bottom layers?

The slab depth and the chairs, together. The clear gap is depth − bottom cover − top cover − one bar diameter. On an 8 in slab with 1.5 in cover each way and #5 bar that is 8 − 1.5 − 1.5 − 0.625 = 4.38 in. The top chairs are what hold that gap open, so they are setting the effective depth of the top steel, not just holding steel off the base.

What happens if the chairs are too short?

The top mat drops and its effective depth drops with it. On a 10 in slab the top steel should sit at 10 − 1.5 − 0.3125 = 8.19 in. One inch low and it is about 7.19 in, roughly 12 per cent less, and section capacity falls with the effective depth. The slab looks identical after the pour, which is why chair height is specified rather than left to the placer.

Do I need chairs under the bottom layer too?

Normally yes, and they do a different job: bottom chairs set the bottom cover, holding the lower mat off the base or the vapour barrier, and their height is just the bottom cover plus half a bar. Where the slab is cast against earth the bottom cover is larger, so the bottom chairs end up taller than the top ones. The tall chairs that set the tier gap carry the top mat.

How far apart should rebar chairs be spaced?

Three to four feet on centre is the usual grid, taken toward 3 ft or tighter where the mat is heavy, the bars are large, or the top mat will be walked on during placing. The limit is how far a bar can span between supports without sagging out of position — it is not the bar spacing of the mat, and tightening the bar spacing does not by itself call for more chairs.

What is chair reinforcement spacing?

It is the same measurement as chair spacing, under the name used on drawings and by suppliers outside the US: the distance between the supports that hold a mat at a set height. The number does not change with the name — 3–4 ft for bar chairs in a slab, 4–5 ft in a footing where there is no top mat to walk on, and the height is still cover plus half a bar. What does change is the fitting: a mesh chair has a groove for wire, a bar chair has a saddle sized to one diameter, so the same spacing on a mesh mat and a #4 mat takes two different chairs.

How many rebar chairs per square foot?

On a 4 ft support grid it is 0.088 chairs per sq ft — one chair per 11.4 sq ft, so a 10 ft × 10 ft bay takes 9. At 3 ft it is 0.131 per sq ft, and at 5 ft 0.052. The three numbers are the same rule read at three spacings, which is why the flat "one per 4 sq ft" figure is so far off: it is 0.25 per sq ft, nearly three times the 4 ft grid, and it corresponds to a 2 ft grid nobody uses.

What is the difference between a chair, a spacer and a dobie?

All three position bar, in different directions. A chair is a vertical stand that sets the height of a mat, and it is what sets cover and tier gap. A spacer sits between parallel bars to hold the horizontal spacing when bars will not stay at drawn centres. A dobie, a small concrete block, is a bearer for getting cover under a bottom mat on ground. A double-layer slab normally needs chairs for height and, where the mat is loose, spacers for spacing.

How many rebar spacers do I need?

Count them off the form perimeter rather than the area, because a spacer only exists where a bar meets a form or another bar. A 20 ft × 40 ft slab has 120 ft of edge; at 4 ft on centre that is 30 spacers for the bottom mat, and 60 if the top mat is clipped as well. That is well under the 66 chairs the same slab takes on a 4 ft grid, which is why the two counts are never quoted together. Four feet is safe for every bar: a #3 sags 0.077 in at four feet and 0.39 in at six, and the six-foot case is already outside the ¼ in that ACI 117 allows on cover.

What this page does not do

It does not choose the chair type or the placement layout. Whether a slab takes a wire chair, a plastic chair, a bar chair or a continuous chair rail, and where chair lines run versus the bar lines, is a placing decision that turns on the slab depth, the bar size and how the mat will be walked. This page gives the three numbers that decision rests on — the height, the tier gap and the count — from the cover and the slab depth you give it. Bar diameters and cover values are nominal, per ACI 318-19. Where the drawing carries a different cover or a coated bar, use the project value.